Floor preparation

Screed and levelling before tiles or parquet

A floor covering is only as good as what lies beneath it. We lay the screed or levelling compound your floor needs, then check flatness and moisture before your tiles or parquet go down.

Ozcan Beyazgul laying a large-format tile on a bed of adhesive using a suction lifterAI-edited image

At a glance

Screed and levelling in a nutshell

A screed is a layer of mortar several centimetres thick, spread or poured over a concrete slab or insulation, which brings the floor to level and can embed underfloor heating pipes. A levelling compound is a floor smoothing layer a few millimetres thick that corrects the flatness of an already sound substrate. Both prepare the floor for tiles or parquet.

The right choice depends on the height to make up, the condition of the substrate, any insulation or underfloor heating, and the covering you have in mind. We carry out this work in Paris, Évreux and the surrounding areas, ahead of tile or parquet installation.

  • Substrate assessment: levels, flatness, strength, moisture
  • Bonded, unbonded or floating screeds, traditional or flowing
  • Levelling compound chosen for the substrate and the room’s use
  • Residual moisture measured before any covering is laid

Materials

Screeds and levelling compounds: the options

Each solution suits a specific situation. The right choice is made on site, once we have examined the substrate and the height available.

  • Traditional sand and cement screed

    A sand and cement mortar ruled off with a straightedge and then floated. Versatile and forgiving, it suits dry and wet rooms alike, but it is thicker than a flowing screed and takes longer to dry.

  • Flowing anhydrite screed

    Based on calcium sulphate, it is pumped into place and levels itself almost unaided. Very flat, it fully surrounds underfloor heating pipes. It is sanded before laying and, because it is sensitive to water, protected by a waterproofing system in exposed areas such as showers.

  • Flowing cement screed

    The same pouring principle with a cement binder: less sensitive to moisture than anhydrite, it can be used in a wider range of rooms. Thicknesses, accepted substrates and drying times follow the product’s technical approval (Avis Technique).

  • Self-levelling compound

    A fluid floor mortar applied in a thin layer, usually a few millimetres, over a sound, primed substrate. It removes flatness defects, but it does not strengthen a weak substrate or make up large differences in level.

  • Fibre-reinforced levelling compound

    Reinforced with fibres, it is designed for substrates that move more, such as rigid timber floors or mixed substrates. It can be applied more thickly, depending on the product, once the floor has been checked for stiffness.

  • Primers and accessories

    Bonding or porosity-regulating primer, perimeter strips, separating membrane, insulation boards under the screed: these discreet components determine how well the whole floor performs.

Our method

Our method, from assessment to final check

A screed or levelling layer deserves the same care as any other part of the job: it will carry your floor covering for years.

  1. Substrate assessment

    We take levels with a laser, check flatness with a straightedge, look at surface strength, cracks and moisture, and measure the height available under doors and at thresholds.

  2. Choosing the solution

    A bonded screed on a sound slab, an unbonded screed on a membrane, a floating screed on insulation, or simply a levelling compound when the substrate is already close to level: it depends on the height to make up and the condition of the substrate.

  3. Preparation

    Removing the old covering where needed, scraping or grinding weak areas, filling holes, treating cracks and thoroughly vacuuming the dust.

  4. Perimeter strips and primer

    A compressible strip is fixed along walls, columns and pipes so that the screed is never locked in place. The primer suited to the substrate is applied before any levelling compound.

  5. Pouring or laying

    A traditional screed is ruled off between level markers, a flowing screed is poured then dappled to release air, and a levelling compound is spread and smoothed. Movement joints go where the system requires them, particularly at doorways.

  6. Drying and protection

    The surface is protected from frost, direct sunlight and draughts for the first few days, then the room is ventilated. Over underfloor heating, the first heating cycle follows the set procedure before anything is laid.

  7. Checks before laying

    Flatness checked with a straightedge, laitance sanded off an anhydrite screed, then residual moisture measured. The floor covering is only laid once the readings meet the requirements of the product and the installation method.

A floor to prepare before tiles or parquet?

Tell us about your substrate and the covering you are planning: we will come and take levels and flatness readings, then suggest the right solution with a free quote.

Request a free quote

Tools

Our tools

Measuring equipment matters as much as the tools used to lay the screed.

  • Rotary laser level and level markers to set the finished height
  • 2 m straightedge and short rule to check flatness
  • Electric paddle mixer and measuring bucket for the right amount of water
  • Screeding rule, float and trowel for traditional screeds
  • Dappling bar for flowing screeds
  • Spiked roller, smoothing trowel and spiked shoes for fresh levelling compound
  • Floor sander and industrial vacuum for laitance and dust
  • Carbide moisture tester and electronic meter for residual moisture

Good practice

Standards and good practice

Screeds and levelling compounds follow precise rules, supplemented by each manufacturer’s instructions.

NF DTU 26.2
The French reference standard for screeds and slabs made with hydraulic binders: bonded, unbonded and floating screeds, minimum thicknesses, joints and working conditions.
Technical approval for flowing screeds
Flowing screeds, anhydrite or cement, are installed according to the product’s Avis Technique or Document Technique d’Application (French technical approvals), which set thicknesses, accepted substrates, timings and drying conditions.
P rating of levelling compounds
Floor levelling compounds are rated (P2, P3, P4) according to the traffic and loads in the rooms they are intended for. The rating chosen takes account of the room and the final floor covering.
Requirements of the final covering
Tiles (NF DTU 52.2) and parquet (NF DTU 51.2 for glued installation, for example) each set their own flatness and moisture tolerances for the substrate: the screed is laid to meet them.
Screed over underfloor heating
A screed that embeds underfloor heating must be thick enough above the pipes and go through a gradual first heating cycle, as set out by the trade rules and the manufacturer, before the floor covering is laid.

Your questions

Frequently asked questions

Screed or levelling compound: how do I know what my floor needs?

It depends on the height to make up and the condition of the substrate. A levelling compound corrects a few millimetres of unevenness on a sound, strong substrate. As soon as several centimetres need making up, underfloor heating has to be embedded, insulation added or a damaged substrate rebuilt, a screed is the answer. Laser and straightedge readings during the visit settle the question.

Can tiles be laid straight onto a concrete slab?

Often, yes, without a screed: the tiling rules allow tiles to be bonded to a slab that is flat, clean, sound and dry enough. A new slab must first have had time to dry. If its flatness falls short, a levelling compound is usually enough. A screed only becomes necessary to make up a difference in level or to incorporate insulation or underfloor heating.

How long should a screed dry before tiles or parquet are laid?

It depends on the type of screed, its thickness, the temperature and the ventilation. For a traditional screed, a rule of thumb suggests about one week per centimetre for the first few centimetres, and longer beyond that. This is only an estimate: before laying, we measure the residual moisture and compare it with the limit accepted for the planned covering.

Why does an anhydrite screed need sanding?

As it dries, an anhydrite screed forms a thin, weak film on its surface called laitance. Left in place, it undermines the adhesive bond and slows the drying of the screed. It is therefore removed by sanding, followed by thorough vacuuming, at the time the manufacturer specifies. A suitable primer is then applied, which is essential under a cement-based adhesive.

Can a levelling compound be applied over a timber floor?

Yes, under certain conditions. The floor must be rigid, securely fixed, dry and ventilated underneath. A fibre-reinforced compound designed for timber substrates is then applied over the recommended primer, with perimeter strips along the walls. If the floor flexes underfoot, it must be stiffened first: no levelling compound can make up for a substrate that moves.

My screed has cracks: is it serious?

Not necessarily. Fine shrinkage cracks often appear as a screed dries and stay stable. A crack that keeps opening, an edge that lifts or an area that sounds hollow, on the other hand, points to a problem with the substrate or the separating layer. Depending on the assessment, we repair the crack (stitching and resin, for example), lay an uncoupling membrane under the tiles or rebuild the area.

Which screed is best over underfloor heating?

Flowing screeds are often preferred: they surround the pipes without air pockets, which helps heat spread, and they can be thinner than a traditional screed. A traditional cement screed remains a proven option. Either way, the thickness above the pipes, the joints and the first heating cycle follow the system’s rules before the covering is laid.

Further reading